Office fit-out for Terumo in Kirkby

New offices built inside a commercial unit in Kirkby, from the partitions and doors to the ceilings, floors, electrics and kitchen. Over three months of work, finished to a fixed date so staff who had been moved out could come back to a building that was ready.

The Terumo commercial unit in Kirkby from outside, with the Marlborough Builders van parked in front
The unit in Kirkby, with our van outside
Client
Terumo
Location
Kirkby, Knowsley
Work
Office fit-out in a commercial unit
Programme
Over three months, to a fixed handover date
Open plan office with grey carpet tiles, a suspended ceiling and new doors with vision panels, fitted out for Terumo in Kirkby
The open plan area: doors with vision panels and a suspended ceiling

The job

Terumo needed working offices inside a commercial unit in Kirkby. While the work went on, their staff were based somewhere else, and the date they were due back was fixed.

That made the programme the most important part of the job. Every trade, from the partitions and doors to the electrics, ceilings, floors and kitchen, was planned around the date the building had to be ready.

The work ran for over three months, and the offices were ready on time, so people moved back into a finished building rather than a site.

What we did

One firm for the whole fit-out, with the specialist trades we brought in working to our programme and answering to us.

  • Partitions

    New partition walls to divide the space into offices and meeting rooms, framed, boarded and finished ready for decorating.

  • Doors

    New internal doors and frames throughout, including doors with vision panels so people can see into a room before they walk in.

  • Ceilings

    Suspended ceilings across the offices, with the light panels set into the grid.

  • Flooring

    Carpet tiles through the offices and open plan area, finished to the new skirting.

  • Electrics

    New lighting and sockets for every room, laid out to suit the way the space would be used.

  • Kitchen

    A new staff kitchen, so the building was ready for everyday use on the day people moved back in.

The finished offices

See our commercial work
The open plan floor, carpeted end to end
Doors with vision panels off the open plan area
A finished office, ready for furniture
Sockets and lighting laid out for the desks
LED panels set into the suspended ceiling
The staff kitchen, behind its own door
The staircase, carpeted to match the offices
A contrasting nosing on every step
The landing at the top of the stairs
A washroom, with cubicle and basin

The factory side

The unit is a factory as well as offices, and the refurbishment took in both. These are the factory areas at the end of the job.

Inside the unit, under the steel roof frame
The main factory floor, cleared and empty
The mezzanine, on its steel columns
Racking and barriers along the factory wall